The project at St. Patrick’s Cathedral required interior and exterior scaffolding while allowing the public to have complete access. Aluminum was chosen due to its high strength-to-weight ratio as well as its resistance to corrosion and rusting, which was important due to the duration of the project. The interior scaffolding used a custom-designed rolling platform in the main nave to allow for full access to the domed ceiling while leaving as much seating as possible.